by Rick Ray | Aug 27, 2017 | Aquatic Habitat Restoration, Streambank Stabilization
Mr. Gorman provided professional assistance to Metro in the selection, hydraulic assessment and engineering design of candidate stream stabilization sites throughout 2.3 stream miles of the Upper Johnson Creek Natural Area. Floods resulting from storm events have...
by Rick Ray | Aug 27, 2017 | Aquatic Habitat Restoration
Mr. Gorman provided the Clackamas River Basin Council and Clackamas County’s Water Environment Services hydraulic engineering, permitting, and final design services to restore approximately 2,200 feet of Rock Creek from its confluence with the Clackamas River,...
by Rick Ray | Aug 27, 2017 | Aquatic Habitat Restoration
Mr. Gorman worked with multiple stakeholders including Oregon Department of Fish and Wildlife, Clackamas River Basin Council, Clackamas County, Clackamas County Soil and Water Conservation District, US Fish and Wildlife Service and private property owners in assessing...
by Rick Ray | Aug 27, 2017 | Aquatic Habitat Restoration
Mr. Gorman was hired by the US Army Corps of Engineers to work closely with them at Camp Humphreys US Army base in South Korea to restore a badly degraded wetland to provide wildlife habit for threatened indigenous species and to serve as one of very few natural areas...
by Rick Ray | Aug 27, 2017 | Aquatic Habitat Restoration, Fish Passage
Mr. Gorman provided the engineering and project management for the preliminary design, permitting, and cost estimation for the replacement of a culvert under US Highway 101 in the Columbia River estuary to restore fish passage and estuarine wetlands. The area to be...
by Rick Ray | Aug 27, 2017 | Aquatic Habitat Restoration, Wetland Mitigation and Banking
Estuarine Wetland and Anadramous Fish Habitat Mitigation Mr. Gorman designed 65 acres of estuarine wetland and anadromous fish rearing habitat in the Columbia River Estuary to mitigate for estuarine and non-tidal fresh water wetlands proposed to be impacted by...